Distribution Technical Standards and Guides
Latest updates to the Distribution Technical Standards
- ES54 S1-01 has been revised and associated advisory 2024-014 R1 released on 2024-08-28
- ES43 C2-03 has been revised on 2024-08-13
- ES54 S3-01, S3-02, and S3-03 have been revised and associated advisory 2024-007 released on 2024-06-21
- ES54 S2-01 has been revised and associated advisory 2023-049 R1 released on 2024-06-10
- ES54 W1-05 has been revised and associated advisory 2024-025 released on 2024-05-06
- Advisory 2023-029 R1 has been released on 2024-05-17
- ES54 S1-01 has been revised and associated advisory 2024-014 released on 2024-05-17
- ES43 B1-03 has been revised on 2024-04-09 and becomes effective 2024-05-02.
- ES54 S2-01 has been revised and associated advisory 2023-049 released on 2024-02-05
- ES54 P1-03 and associated advisory 2023-043 were released on 2023-11-17
- ES54 S1-02 has been released, ES53 S1-01 has been revised, and associated advisory 2023-029 has been released on 2023-11-17
- ES43 B1-13 has been released on 2023-11-07
- ES43 C5-01 has been released on 2023-07-24
- ES43 B1-16 has been revised on 2023-07-07
- ES53 S1-01, ES54 S0-02, ES54 S0-04, ES54 S0-05, ES54 S1-03, and ES54 S1-04 have been revised, and associated advisories 2022-010 R1, 2022-023 R1, and 2023-018 released, on 2023-06-30
- ES54 B3-06 has been released, and associated advisory 2023-019 released, on 2023-06-26
- ES54 standards C1-05, H0-02, H2-04, and W1-05 have been revised, associated advisories 2023-010 and 2023-012 released, May 2023
- ES54 S0 General Notes standards, S1 Secondary Single-Phase Services standards, and S3 Medium-Voltage (Primary) Services standards (S3-01, S3-02, and S3-03) have been revised December 2022
- Advisories 2022-001, 2022-010, and 2022-023 related to ES54 section S Services revisions, December 2022
- ES54 Section F Transformer Pads and Vaults and ES54 Section H Ducts have been revised September 2022.
Section quick access
- General Publications
- Primary Guide: Requirements for customer-owned primary services supplied at 4 kV to 35 kV
- Distribution Standards – ES43
- Distribution Standards – ES53
- Distribution Standards – ES54
- ES54 Underground Civil – Section A – Introduction
- ES54 Underground Civil – Section B – Pull/Splices, Service, and Junction Boxes
- ES54 Underground Civil – Section C – Vaults
- ES54 Underground Civil – Section D – Junction Pads
- ES54 Underground Civil – Section E – Switchgear Vaults and Pads
- ES54 Underground Civil – Section F – Transformer Pads and Vaults
- ES54 Underground Civil – Section G – Drainage Assemblies
- ES54 Underground Civil – Section H – Duct
- ES54 Underground Civil – Section J – Joint Trenching
- ES54 Underground Civil – Section M – Pilasters, Terminal Poles
- ES54 Underground Civil – Section P – Public Safety
- ES54 Underground Civil – Section R – Grounding
- ES54 Underground Civil – Section S – Services
- ES54 Underground Civil – Section U – Engineering
- ES54 Underground Civil – Section W – Construction Specifications
- ES54 Underground Civil – Section Z – Material Catalogue
- ES54 Information Bulletins
- Distribution Standards – ES55
- Class of Work Specifications
- Revenue metering requirements
- Distribution Generator Interconnections Technical Requirements
- Revenue Metering Bulletin
General Publications
Title | Issue date | Effective date |
---|---|---|
Service duct wall-entry declaration [PDF, 310 KB] | August 1, 2024 | August 1, 2024 |
Underground transformation options for space constrained urban developments [PDF, 323 KB] | June 6, 2022 | June 6, 2022 |
Primary Guide: Requirements for customer-owned primary services supplied at 4kV to 35 kV
Title | Issue date | Effective date |
---|---|---|
Primary Guide 2021 (Revision 3.1) [PDF, 9.3 MB] | April 2021 | September 30, 2021 |
Information Bulletin – Release of Primary Guide 2021 (Revision 3.1) [PDF, 199 KB] | April 2021 | April 2021 |
Customer Guide – Primary Service Connections Process [PDF, 73 KB] | July 2018 | July 2018 |
ES43 Overhead Electrical - Sections B and C - Clearances and Joint and Secondary Use
Title | Issue date | Effective date |
---|---|---|
ES43 B - Clearances [PDF, 2.5 MB] | April 9, 2024 | May 2, 2024 |
ES43 C – Joint and Secondary Use [PDF, 2.5 MB] | August 13, 2024 | August 13, 2024 |
ES43 Overhead Electrical – Section L – Street lighting
Title | Issue date | Effective date |
---|---|---|
ES43 L – Street Lighting [PDF, 1.3 MB] | September 2020 | November 2020 |
ES43 Overhead Electrical - Section M - Terminal Poles
Title | Issue date | Effective date |
---|---|---|
ES43 M1-10 – Terminal Poles Pilaster Location [PDF, 1.2 MB] | July 6, 2020 | July 6, 2020 |
ES43 Overhead Electrical – Section N – Secondaries and services
Title | Issue date | Effective date |
---|---|---|
ES43 N0 – Table of Contents [PDF, 807 KB] | November 2012 | November 2012 |
ES43 N1 – General [PDF, 1.7 MB] | November 2012 | November 2012 |
ES43 N2 – Service Connections [PDF, 2.4 MB] | November 2012 | November 2012 |
ES43 Overhead Electrical – Section R
Title | Issue date | Effective date |
---|---|---|
ES43 R2-01 – Bonding and Grounding Ground Electrode Installations Ground Rods at Wood Poles and Multiple Ground Rods [PDF, 1.2 MB] | March 2018 | March 2018 |
ES53 Underground Electrical – Section S – Services
Title | Issue date | Effective date |
---|---|---|
ES53 S0 – Table of Contents [PDF, 627 KB] | June 30, 2023 | June 30, 2023 |
ES53 S1 – Secondary Services Single Phase [PDF, 899 KB] | November 17, 2023 | November 17, 2023 |
ES53 S2 – Secondary Services Three Phase [PDF, 1.7 MB] | March 2011 | March 2011 |
ES53 S3 – Primary Services [PDF, 1.3 MB] | November 2014 |
November 2014 |
ES53 S4 – Ornamental street lighting services up to 50A [PDF, 444 KB] | October 2003 | October 2003 |
Information Bulletin 2023-029 – Limited Release of Single-Phase Secondary 320 A 120/240 V Services with Self-Contained Metering [PDF, 1.5 MB] | November 17, 2023 | November 17, 2023 |
Information Bulletin 2023-018 – Revised ES53 S1-01 for 120/240 V Single-Phase Secondary Services up to 600 A [PDF, 2.3 MB] | June 30, 2023 | June 30, 2023 |
Information Bulletin – Equipment and Connection Changes for Secondary Underground Customer Services, 120/240 V up to 600 A, Single-Phase [PDF, 1.8 MB] | July 2017 | July 2017 |
Title: ES54 Section A - Introduction [PDF, 639 MB]
Issue date: 2024-06-21
Effective date: 2024-06-21
Title: ES54 B – Pull/Splice, Service, and Junction Boxes [PDF, 3.4 MB]
Issue date: 2023-06-26
Effective date: 2023-06-26
Title: ES54 C – Vaults [PDF, 2.3 MB]
Issue date: 2023-04
Effective date: 2023-04
Title: ES54 D – Junction Pads [PDF, 325 KB]
Issue date: 2017-09
Effective date: 2017-09
Title: ES54 E – Switchgear Vaults and Pads [PDF, 2.6 MB]
Issue date: 2021-10
Effective date: 2021-10
Title: ES54 F – Transformer Pads and Vaults [PDF, 2.9 MB]
Issue date: 2022-09
Effective date: 2022-09
Title: ES54 G – Drainage Assemblies [PDF, 369 KB]
Issue date: 2016-03
Effective date: 2016-03
Title: ES54 H – Duct [PDF, 2.1 MB]
Issue date: 2023-04
Effective date: 2023-04
Title: ES54 J – Joint Trenching [PDF, 1.2 MB]
Issue date: 2021-09
Effective date: 2021-09
Title: ES54 M – Pilasters, Terminal Poles [PDF, 313 KB]
Issue date: 2016-03
Effective date: 2016-03
Title: ES54 P – Public Safety [PDF, 1.6 MB]
Issue date: 2023-11-17
Effective date: 2023-11-17
Title: ES54 R – Grounding [PDF, 1.4 MB]
Issue date: 2017-09
Effective date: 2017-09
Title: ES54 U – Engineering [PDF, 1.6 MB]
Issue date: 2022-03
Effective date: 2022-03
Title: ES54 W – Construction Specifications [PDF, 524 KB]
Issue date: 2024-05-06
Effective date: 2024-05-06
Title: ES54 Z – Material Catalogue [PDF, 1.6 MB]
Issue date: 2018-10
Effective date: 2018-10
Title | Issue date | Effective date |
---|---|---|
Information Bulletin – Release of New and Revised ES54 Section S Medium-Voltage (Primary) Services Standards [PDF, 2.3 MB] | November 25, 2022 | June 30, 2023 |
Information Bulletin - Revised ES54 S0-02 Services General Notes and Release of ES54 S0-05 Service Ducts and Trenches [PDF, 205 KB] | November 25, 2022 | June 30, 2023 |
Information Bulletin - Release of ES54 S0-04 and S1 Standards for 120/240 V Single-Phase Secondary Services up to 600 A [PDF, 292 KB] | November 25, 2022 | June 30, 2023 |
Information Bulletin – Revised ES54 F Transformer Pads and Vaults, and ES54 H Ducts [PDF, 225 KB] | September 7, 2022 | September 7, 2022 |
Information Bulletin – Revised ES54 U2-02 Bollards [PDF, 125 KB] | March 7, 2022 | March 7, 2022 |
ES55 Design Standards - Section Q - Power Quality Standards - General
Title | Issue date | Effective date |
---|---|---|
ES55 Q1-02 – Electromagnetic Compatibility [PDF, 1.7 MB] | January 2015 | January 2015 |
ES55 Q1-04 – Apparent Power [PDF, 2.1 MB] | February 2017 | February 2017 |
ES55 Design Standards – Section Q - Low-Voltage Customer Emission Limits: Requirements for customer emissions when supplied at 120 V to 600 V
Title | Issue date | Effective date |
---|---|---|
ES55 Q3-04 – Rapid Voltage Changes (RVCs) [PDF, 2.4 MB] | December 2016 | December 2016 |
ES55 Q3-05 – Voltage Flicker [PDF, 2.4 MB] | December 2016 | December 2016 |
ES55 Q3-07 – Voltage Unbalance [PDF, 2.4 MB] | December 2016 | December 2016 |
ES55 Design Standards - Section Q - Medium-Voltage Customer Emission Limits: Requirements for customer emissions when supplied at 4 kV to 35 kV
Title | Issue date | Effective date |
---|---|---|
ES55 Q4-04 – Rapid Voltage Changes (RVCs) [PDF, 2.4 MB] | December 2016 | December 2016 |
ES55 Q4-05 – Voltage Flicker [PDF, 2.4 MB] | December 2016 | December 2016 |
ES55 Q4-07 – Voltage Unbalance [PDF, 2.4 MB] | December 2016 | December 2016 |
ES55 Q4-09 – Current Harmonics [PDF, 2.4 MB] | December 2016 | December 2016 |
Class of Work Specifications
Title | Issue date | Effective date |
---|---|---|
Construction of Underground Electrical Distribution Structures by a BC Hydro Contractor (No. 1322 R11) [PDF, 1.1 MB] | July 13, 2016 | July 13, 2016 |
Construction of Underground Electrical Distribution Structures by a Customer (No. 1323 R10) [PDF, 1.1 MB] | July 13, 2016 | July 13, 2016 |
Information Bulletin – Backfill, R1 [PDF, 1.4 MB] | February 2015 | February 2015 |
Revenue Metering Requirements
Title | Issue date | Effective date |
---|---|---|
Secondary Voltage Revenue Metering – 750 V and less [PDF, 1.7 MB] | February 2024 | February 2024 |
Requirements for Primary Service Revenue Metering – 4kV to 35kV [PDF, 2.0 MB] | July 20, 2022 | July 20, 2022 |
Complex Revenue Metering [PDF, 1.6 MB] | March 2014 | March 2014 |
Advisory notice: Multiple occupancy metering requirements and resale of electricityThe purpose of the advisory notice [PDF, 94 KB] is to draw the attention of developers and owners of multiple occupancy buildings, and their electrical consultants and contractors to the requirements of BC Hydro's Electric Tariff [PDF, 7.8 MB] in relation to the electricity supply and metering configurations, including for electrical vehicle charging stations, applicable to these buildings. |
Distribution Generator Interconnections Technical Requirements
Title | Issue date | Effective date |
---|---|---|
Distribution Generator Interconnection Requirements [PDF, 560 KB] | 2010 | 2010 |
Distribution Generator Interconnection Requirements Amendment 1 [PDF, 43 KB] | October 15, 2015 | October 15, 2015 |
Amendment 2 Requirements for terminals supplying ships capable of running in parallel with BC Hydro (CTT Shore Power) [PDF, 407 KB] | October 17, 2017 | October 17, 2017 |
Distribution Power Generator Islanding Guidelines [PDF, 143 KB] | June 2006 | June 2006 |
100 kW and Below Distribution Generation Interconnection Requirements [PDF, 599 KB] | October 17, 2014 | October 17, 2014 |
Revenue Metering Bulletins
Title | Issue date | Effective date |
---|---|---|
Meter Sockets List [PDF, 145 KB] | February 21, 2024 | April 1, 2024 |
Conduit Length Material Bulletin [PDF, 170 KB] | February 28, 2022 | February 28, 2022 |
EATON RCPM 200A Combination Meter Socket and Loadcentre [PDF. 154 KB] | October 25, 2021 | October 25, 2021 |