Skip to content

Be prepared for storm season. Safety tips and videos

Distribution Technical Standards and Guides

Latest updates to the Distribution Technical Standards

Section quick access

 

General Publications

Title Issue date Effective date
Service duct wall-entry declaration [PDF, 310 KB] August 1, 2024 August 1, 2024
Underground transformation options for space constrained urban developments [PDF, 323 KB] June 6, 2022 June 6, 2022

 

Primary Guide: Requirements for customer-owned primary services supplied at 4kV to 35 kV

Title Issue date Effective date
Primary Guide 2021 (Revision 3.1) [PDF, 9.3 MB] April 2021 September 30, 2021
Information Bulletin – Release of Primary Guide 2021 (Revision 3.1) [PDF, 199 KB] April 2021 April 2021
Customer Guide – Primary Service Connections Process [PDF, 73 KB] July 2018 July 2018

Top of page

Distribution Standards – ES43

ES43 Overhead Electrical - Sections B and C - Clearances and Joint and Secondary Use

Title Issue date Effective date
ES43 B - Clearances [PDF, 2.5 MB] April 9, 2024 May 2, 2024
ES43 C – Joint and Secondary Use [PDF, 2.5 MB] August 13, 2024 August 13, 2024

 

ES43 Overhead Electrical – Section L – Street lighting

Title Issue date Effective date
ES43 L – Street Lighting [PDF, 1.3 MB] September 2020 November 2020

 

ES43 Overhead Electrical - Section M - Terminal Poles

Title Issue date Effective date
ES43 M1-10 – Terminal Poles Pilaster Location [PDF, 1.2 MB] July 6, 2020 July 6, 2020

 

ES43 Overhead Electrical – Section N – Secondaries and services

Title Issue date Effective date
ES43 N0 – Table of Contents [PDF, 807 KB] November 2012 November 2012
ES43 N1 – General [PDF, 1.7 MB] November 2012 November 2012
ES43 N2 – Service Connections [PDF, 1.2 MB] October 2024 October 2024

 

ES43 Overhead Electrical – Section R

Title Issue date Effective date
ES43 R2-01 – Bonding and Grounding Ground Electrode Installations Ground Rods at Wood Poles and Multiple Ground Rods [PDF, 1.2 MB] March 2018 March 2018

 

Distribution Standards – ES53

ES53 Underground Electrical – Section S – Services

Title Issue date Effective date
ES53 S0 – Table of Contents [PDF, 627 KB] June 30, 2023 June 30, 2023
ES53 S1 – Secondary Services Single Phase [PDF, 899 KB] November 17, 2023 November 17, 2023
ES53 S2 – Secondary Services Three Phase [PDF, 1.7 MB] March 2011 March 2011
ES53 S3 – Primary Services [PDF, 175 KB] October 2024 October 2024
ES53 S4 – Ornamental street lighting services up to 50A [PDF, 444 KB] October 2003 October 2003
Information Bulletin 2023-029 – Limited Release of Single-Phase Secondary 320 A 120/240 V Services with Self-Contained Metering [PDF, 1.5 MB] November 17, 2023 November 17, 2023
Information Bulletin 2023-018 – Revised ES53 S1-01 for 120/240 V Single-Phase Secondary Services up to 600 A [PDF, 2.3 MB] June 30, 2023 June 30, 2023
Information Bulletin – Equipment and Connection Changes for Secondary Underground Customer Services, 120/240 V up to 600 A, Single-Phase [PDF, 1.8 MB] July 2017 July 2017

 

Distribution Standards – ES54

Title: ES54 Section A - Introduction [PDF, 639 MB]
Issue date: 2024-06-21
Effective date: 2024-06-21

Title: ES54 C – Vaults [PDF, 2.3 MB]
Issue date: 2023-04
Effective date: 2023-04

Title: ES54 D – Junction Pads [PDF, 325 KB]
Issue date: 2017-09
Effective date: 2017-09

Title: ES54 E – Switchgear Vaults and Pads [PDF, 2.6 MB]
Issue date: 2021-10
Effective date: 2021-10

Title: ES54 F – Transformer Pads and Vaults [PDF, 2.9 MB]
Issue date: 2022-09
Effective date: 2022-09

Title: ES54 G – Drainage Assemblies [PDF, 369 KB]
Issue date: 2016-03
Effective date: 2016-03

Title: ES54 H – Duct [PDF, 2.1 MB]
Issue date: 2023-04
Effective date: 2023-04

Title: ES54 J – Joint Trenching [PDF, 1.2 MB]
Issue date: 2021-09
Effective date: 2021-09

Title: ES54 M – Pilasters, Terminal Poles [PDF, 313 KB]
Issue date: 2016-03
Effective date: 2016-03

Title: ES54 P – Public Safety [PDF, 1.6 MB]
Issue date: 2023-11-17
Effective date: 2023-11-17

Title: ES54 R – Grounding [PDF, 1.4 MB]
Issue date: 2017-09
Effective date: 2017-09

 

Title Issue date Effective date
ES54 S0-01 – Services – Table of Contents [PDF, 100 KB] November 17, 2023 November 17, 2023
ES54 S0-02 – Services – General Notes [PDF, 729 KB] June 30, 2023 July 31, 2023
ES54 S0-03 – Services – General Notes – Medium-Voltage (Primary) Services [PDF, 1.7 MB] February 2022 June 2023
ES54 S0-04 – Services – General Notes – Secondary Services [PDF, 810 KB] June 30, 2023 July 31, 2023
ES54 S0-05 – Services – General Notes – Service Ducts and Trenches [PDF, 936 KB] June 30, 2023 July 31, 2023
ES54 S1-01 – Secondary Single-Phase Services – 200 A Single and 400 A Multiple Self-Contained Meter Installation [PDF, 1.9 MB] August 28, 2024 January 1, 2025
ES54 S1-02 - Secondary Single-Phase Services 320 A Self-Contained Meter Installation [PDF, 1.8 MB] November 17, 2023 November 17, 2023
ES54 S1-03 - Secondary Single-Phase Services - 400 A and 600 A CT-Based Meter Installation [PDF, 1.8 MB] June 30, 2023 July 31, 2023
ES54 S1-04 - Secondary Single-Phase Services - 200 A to 600 A Pad-Mounted Kiosk and Pedestal, Self-Contained and CT-Based Meter Installation [PDF, 1.5 MB] June 30, 2023 July 31, 2023
ES54 S2-01 – Secondary Three-Phase Services 120-208 V and 347-600 V up to 1600 A Private Property Installation [PDF, 910 KB] June 10, 2024 July 30, 2024
ES54 S2-02 – Secondary Three Phase Dip Services up to 800A [PDF, 1.2 MB] August 2017 August 2017
ES54 S3-01 – Primary Services Dead-Front Outdoor Kiosk Private Property Installation [PDF, 392 KB] June 21, 2024 September 30, 2024
ES54 S3-02 – Primary Services Live-Front Outdoor Kiosk Private Property Installation [PDF, 409 KB] June 21, 2024 September 30, 2024
ES54 S3-03 – Primary Services Indoor Switchgear Private Property Installation [PDF, 647 KB] June 21, 2024 September 30, 2024
ES54 S3-04 – Primary Services - Service Duct to Rear Yard [PDF, 1.2 MB] March 2016 March 2016
ES54 S4-01 – Streetlighting Services to 50A [PDF, 1.2 MB] March 2016 March 2016

 

Title: ES54 U – Engineering [PDF, 1.6 MB]
Issue date: 2022-03
Effective date: 2022-03

Title: ES54 W – Construction Specifications [PDF, 524 KB]
Issue date: 2024-05-06
Effective date: 2024-05-06

Title: ES54 Z – Material Catalogue [PDF, 1.6 MB]
Issue date: 2018-10
Effective date: 2018-10

ES54 Information Bulletins

Note: Arranged by issue date

Title Issue date Effective date
Information Bulletin – Revisions to ES54 S2-01 Standards and Customer Secondary Service Equipment [PDF, 3.8 MB] November 2018 November 2018
Information Bulletin – Revision to ES54 Standards, Sections B, C, F, H, U and Z [PDF, 1.1 MB] October 2018 October 2018
Information Bulletin – Pad-mounted transformer installation on private property (R3) [PDF, 1.0 MB] March 2018 March 2018
Information Bulletin – ES54 B3-03 and B3-04 for sidewalk duty lightweight service boxes [PDF, 559 KB] November 2017 November 2017
Information Bulletin – Ground rod connector stock no longer held as a separate item at AE Concrete Ltd. plant storage [PDF, 1.6 MB] October 2017 October 2017
Information Bulletin – Revisions to grounding standards and installation of precast grounded bollards [PDF, 2.1 MB] September 2017 September 2017
Information Bulletin – Revisions to customer-owned primary services, indoor and outdoor type, underground supply [PDF, 1.5 MB] August 2017 August 2017
Information Bulletin – BC Hydro-owned switchgear inside customer-owned buildings [PDF, 1.8 MB] August 2017 August 2017
Information Bulletin – Banned collar-type transfer switch for 120/240 V meter socket services – reaffirmed [PDF, 2.9 MB] February 2017 February 2017
Information Bulletin – Transfer switches for secondary customer services emergency standby generators – reaffirmed [PDF, 1.9 MB] June 2016 June 2016
Information Bulletin – 4-way and T-type pull and splice vaults, R3 [PDF, 2.2 MB] January 2016 January 2016

 

Distribution Standards – ES55

ES55 Design Standards - Section Q - Power Quality Standards - General

Title Issue date Effective date
ES55 Q1-02 – Electromagnetic Compatibility [PDF, 1.7 MB] January 2015 January 2015
ES55 Q1-04 – Apparent Power [PDF, 2.1 MB] February 2017 February 2017

 

ES55 Design Standards – Section Q - Low-Voltage Customer Emission Limits: Requirements for customer emissions when supplied at 120 V to 600 V

Title Issue date Effective date
ES55 Q3-04 – Rapid Voltage Changes (RVCs) [PDF, 2.4 MB] December 2016 December 2016
ES55 Q3-05 – Voltage Flicker [PDF, 2.4 MB] December 2016 December 2016
ES55 Q3-07 – Voltage Unbalance [PDF, 2.4 MB] December 2016 December 2016

 

ES55 Design Standards - Section Q - Medium-Voltage Customer Emission Limits: Requirements for customer emissions when supplied at 4 kV to 35 kV

Title Issue date Effective date
ES55 Q4-04 – Rapid Voltage Changes (RVCs) [PDF, 2.4 MB] December 2016 December 2016
ES55 Q4-05 – Voltage Flicker [PDF, 2.4 MB] December 2016 December 2016
ES55 Q4-07 – Voltage Unbalance [PDF, 2.4 MB] December 2016 December 2016
ES55 Q4-09 – Current Harmonics [PDF, 2.4 MB] December 2016 December 2016

 

Class of Work Specifications

Title Issue date Effective date
Overhead Electrical Distribution Work (No. 1319 R8) [PDF, 249 KB] December 2015 December 2015
Construction of Underground Electrical Distribution Structures by a BC Hydro Contractor (No. 1322 R11) [PDF, 1.1 MB] July 13, 2016 July 13, 2016
Construction of Underground Electrical Distribution Structures by a Customer (No. 1323 R10) [PDF, 1.1 MB] July 13, 2016 July 13, 2016
Trenchless Installation of Electrical Conduits by a BC Hydro Contractor (No. 1324 R0) [PDF, 539 KB] January 7, 2013 January 7, 2013
Trenchless Installation of Electrical Conduits by a BC Hydro Customer (No. 1325 R0) [PDF, 542 KB] January 15, 2013 January 15, 2013
Duct Crossing of Bridges (No. 1326 R1) [PDF, 383 KB]

Addenda:

March 26, 2021 March 26, 2021
Information Bulletin – Backfill R1 [PDF, 1.4 MB] February 2015 February 2015

Top of page

Revenue Metering Requirements

Title Issue date Effective date
Secondary Voltage Revenue Metering – 750 V and less [PDF, 1.7 MB] February 2024 February 2024
Requirements for Primary Service Revenue Metering – 4kV to 35kV [PDF, 2.0 MB] July 20, 2022 July 20, 2022
Complex Revenue Metering [PDF, 1.6 MB] March 2014 March 2014

Advisory notice: Multiple occupancy metering requirements and resale of electricity

The purpose of the advisory notice [PDF, 94 KB] is to draw the attention of developers and owners of multiple occupancy buildings, and their electrical consultants and contractors to the requirements of BC Hydro's Electric Tariff [PDF, 7.8 MB] in relation to the electricity supply and metering configurations, including for electrical vehicle charging stations, applicable to these buildings.

Top of page

Distribution Generator Interconnections Technical Requirements

Title Issue date Effective date
Distribution Generator Interconnection Requirements [PDF, 560 KB] 2010 2010
Distribution Generator Interconnection Requirements Amendment 1 [PDF, 43 KB] October 15, 2015 October 15, 2015
Amendment 2 Requirements for terminals supplying ships capable of running in parallel with BC Hydro (CTT Shore Power) [PDF, 407 KB] October 17, 2017 October 17, 2017
Distribution Power Generator Islanding Guidelines [PDF, 143 KB] June 2006 June 2006
100 kW and Below Distribution Generation Interconnection Requirements [PDF, 599 KB] October 17, 2014 October 17, 2014

Top of page

Revenue Metering Bulletins

Title Issue date Effective date
Meter Sockets List [PDF, 135 KB] October 21, 2024 October 21, 2024
Conduit Length Material Bulletin [PDF, 170 KB] February 28, 2022 February 28, 2022
EATON RCPM 200A Combination Meter Socket and Loadcentre [PDF. 154 KB] October 25, 2021 October 25, 2021

Top of page